From 2001 to 2004, Offshore Petroleum Engineering Survey of SINOPEC and DNV have performed a successful risk assessment for three platforms that located in Shengli offshore area.

 
  • 2001年至2004年,中国石化海上石油工程技术检验站与挪威船级社(DNV)成功地对胜利浅海海域的三座平台进行了量化风险评估。
今日热词
目录 附录 查词历史