您要查找的是不是:
- Flight Test Control 飞行试验控制
- Joint Flight Test Control Group 联合试飞控制组
- Participate in the flight test procedures improvement. 参与试飞程序的完善。
- Its characteristics such as good control quality, high reliability and excellent maintainability have been demonstrated in the evaluation flight test throughout flight envelope. 该系统具有控制品质良好、可靠性高和外场使用维护方便等特点。
- Research of JL8 aircraft stall and spin flight test is described in this paper. 叙述了JL8飞机失速尾旋试飞状态、试飞方法和试飞结果。
- The Administer Test Controller dialog is displayed. 随即出现“管理测试控制器”对话框。
- Any flight test and wind tunnel correlation always suffers from a great number of unknowns. 在对飞行试验与风洞试验进行比较时总有大量的未知数。
- Describe the basic progression of the first flight tests. 请描述一下首飞测试的基本过程。
- Load test plug-ins allow for custom load test control, such as, aborting a load test when a counter or error threshold is met. 负载测试插件允许使用自定义负载测试控件,如在达到计数器或错误阈值时中止负载测试。
- A test rig is made up of a test controller and one or more agents. 测试远程测试机组由一个测试控制器和一个或多个代理组成。
- This marks the second time the NLOS-LS CLU was used in a flight test of the PAM missile. NLOS-LS为指挥官提供即时、精确响应的火力,打击移动和静止的陆地、海上目标。
- Click Close in the Administer Test Controller dialog box. 在“管理测试控制器”对话框中单击“关闭”。
- The Administer Test Controller dialog box is displayed. 将显示“管理测试控制器”对话框。
- Boeing has begun flight testing the mission system aboard the first 737-based airborne early warning and control (AEW&C) aircraft earmarked for Australia’s Project Wedgetail. 日前,波音公司开始对其首架基于737的机载早期预警控制(AEW&C)飞机作战系统进行飞行测试,这架飞机是根据澳大利亚“楔尾”项目制造的。
- The flight test monitor and command system is main part of flight test engineering. 试飞监控与指挥系统是飞行试验工程中的重要组成部分。
- In addition, preliminary proof for the half system flight test program of SITAN algorithm was discussed. 此外还对SITAN系统半 系统试飞方案作了初步的论证工作。
- In view of test control malpractice and the basis existing test basic flow has designed the test question examination paper management system management system. 针对考试管理的弊端,并根据现有考试的基本流程设计了试题试卷管理系统。
- The poesend problems in evaluation antiship missile flight test are pcinted out. 指出现行反舰导弹飞行试验结果评定的命中域标准存在的问题。
- Fixture and the test control system been used to adjust the calibration recall or preventive maintainance schedules to eliminate out of tolerance conditions? 量规,夹具和检测控制系统的日期已经调整符合为排除公差条件的标准取消或者预备维修日程了嘛?
- A kind of aircraft radome checked by this method has undergone flight tests. 该方法验证的天线罩防冰装置已经经历了飞行的考验。