Five-yearly operational testing should be done by lowering the boat loaded to a proof load of 1.1times the maximum working load of the winch, or equivalent load.

 
  • 五年度操作测试应该使船装载超过最大装载负荷的1.;1倍或者等于装载负荷的货物,然后下沉。
今日热词
目录 附录 查词历史