Finally, I get the general performance evaluation system for project managers by tabulating the three sub-system above, and at the same time simply describe the way of evaluation of tabulation.

 
  • 最后,将这三个体系汇总,本文提出了一套项目经理综合绩效评价指标体系,并对汇总的评价方法作了简单的说明。
今日热词
目录 附录 查词历史