您要查找的是不是:
- Finally, we use Extensive Markup Language (XML) to express the general engineering change document, and the Document Type Definition (DTD) of engineering change beaed on XML is also given. 最后 ,引入扩展标记语言来描述通用的工程更改文档 ,并给出了基于XML的工程更改文档类型定义方案。
- Engineering Change Document 工程变化文件
- Change Document Display Master Rec. 更改文档显示主记录。
- Familiar with Engineering Change Control process. 熟练掌握工程更改控制流程。
- Track quality for the engineering change parts. 对工程变更件产品的质量追踪。
- Take the lead of engineering change about product. 负责领导产品方面的工程变更。
- Control of product engineering change. 产品工程变更之管制。
- Changes document direction to right-to-left. 将文档方向改为从右向左。
- Coordinate Engineering change timing with related parties. 与相关部门就工艺变更日程进行协调。
- Is responsible for any design change documentation "ECR‘s"back to Amstore Engineering, and new print submissions from Supplier back to Amstore. 负责将所有在产品设计上进行的改动文档以ECR的方式回传给公司工程部,同时也需要将供应商对于新图纸的意见告知公司。
- Coordination and implementation of Engineering changes. 工程改变的协调及补充.
- Job PurposeTo manage control and administer all Engineering Change activities within the Engineering dept. 负责工程部门所有工程变更活动的控制和管理。
- ECMA Electronic Component Manufacturer Association ECN Engineering Change Notice. 工程更改通知工程需要更改或发表说明时使用的文件。
- Within the folder on all documents (a folder) Batch Rename: Batch Change document first name or extensions. 对文件夹内的所有文件(子文件夹)批量重命名:批量更改文件的主名或扩展名。
- Update manufacturing orders as necessary by monitoring system inquiries and new engineering change orders. 通过监视系统需求和新的工程变化订单来更新生产订单。
- Is a formal engineering change procedure implemented? Briefly describe the process. 是否实施工程更改操作?简要描述该过程。
- Review and distribute change documents, document control of contract drawings at the project site. Expediting of materials to the project site. 审核、分发变更文件,项目现场合同图纸及现场变更文件控制以及现场材料的催交;
- PLM vendors with a PDM background have long had interfaces to ERP systems to handle engineering change notices. PDM背景的PLM软件商早就设计了ERP系统交互界面来处理工程变更通知。
- Process and line set all engineering change notices for timely, accurate, cost effective implementation into production. 及时处理工程变更通知,将精确的、有效的成本执行到生产工作中。
- General data includes engineering change level, phase covered (prototype, pre-launch, production), key contact, part/process step number, process name/operation description. 基本数据包括工程更改等级、所处阶段样件试生产生产、主要联系人、零件/过程步骤编号、过程名称/作业描述。
- 今日热词
-
- 深远海浮式风电平台 - deep-sea floating wind power platform
-
- 京雄高速公路 - Beijing-Xiongan expressway
-
- 农业及相关产业增加值 - the added value of agriculture and related industries