Earthworks zero line is determined by constructing the spatial gridding curved surface model of the original terrain and the field leveling design terrain by digital elevation mode(DEM).

 
  • 目的利用数字高程模型(digital elevation model;DEM)构造原始地形和场平设计地形的空间网格曲面模型;确定土方工程中的零线.
今日热词
目录 附录 查词历史