During the 2nd stage river diversion for the Merowe Hydroelectric Power Station,the pontoon is needed to be built downstream the spillway.

 
  • 在苏丹麦洛维水电站二期导流期间,溢流坝下游需要设置施工浮桥。
今日热词
目录 附录 查词历史