During bank slope excavation in cofferdam in a harbor construction, the work had to be suspended due to water leakage (river water and ground water) into the foundation pit.

 
  • 摘要某码头工程在采用围堰进行岸坡开挖过程中,受江水和地下水位的影响,基坑内有水渗入导致工程无法进行。
今日热词
目录 附录 查词历史