Due to the tight design term, the basic information is not complete and the scheme is changed repeatedly, it is hard to the design with quality assurance completely.

 
  • 摘要由于项目设计工期紧、基础资料不齐全、方案反复变化等因素,给保质保量完成设计任务带来了一定困难。
今日热词
目录 附录 查词历史