Determinations of the location and long axial direction are the key to design of underground powerhouse of hydropower engineering.These two problems are solved by accounting the geological conditions.

 
  • 摘要水电工程地下主厂房的位置和长轴方位的选择是其设计的关键,这两个问题主要是根据地质条件确定。
今日热词
目录 附录 查词历史