您要查找的是不是:
- Design Review Team 设计审核队
- Coordinate the design review process. 协调设计评审。
- Design review meeting, each team presenting approach and changes to implement each backlog item. Reassign changes as required. 组织总结会议,各项目小组阐明为实现各自的待定项所需的方法和变更。按需要重新分配变更。
- Design review meeting, each team presenting approach and changes to implement each backlog item. Reassign changes as required.? 组织总结会议,各项目小组阐明为实现各自的待定项所需的方法和变更。按需要重新分配变更。?
- Responsibilities: Lead the LNG project team to carry out the project, including design review, TPI for the LNG pro...... ... 公司名称:法利咨询(上海)有限公司(法国国际检验局工业与设施事业部)工作地点:上海市发布时间:2009-6-28
- Involvement in Design Review Process with customers, suppliers and CTT UK. 参与和客户,供应商和英国总部的设计回顾。
- Design review on Mine General Hospital of Shenfu Dongsheng Coal Company Ltd. 神府东胜煤炭有限责任公司矿区总医院设计回顾。
- Provisions for die mounting will be specified at the preliminary design review. 在初级设计中应详细说明提供的模具安装说明。
- Design Review and Community Design Standards, City of Portland Oregon. 回顾显示代码内容的表格,显示替选方案及任意设计案之评论程序。
- Review Team Foundation Server components to determine which components you might want to install. 检查Team Foundation Server组件以确定可能要安装的组件。
- Design review of boilers according to the codes TRD and ASME Sect. I. 按照TRD规范和ASME(美国机械工程师协会)第一部分进行对锅炉的设计审核。
- To date, our review team consists of individuals from the Americas, Europe, South East Asia and China. 目前,我们的评论员队伍是由来自美洲,欧洲,东南亚和中国的人员组成。
- Design Review - Product concept can be captured and reviewed. 设计审查-产品概念可以捕获和审查。
- Review Team Foundation Server maintenance requirements and develop a Team Foundation Server backup and restore strategy. 检查Team Foundation Server维护要求,并制订Team Foundation Server备份和恢复策略。
- After Named Supplier - Participate in Design Reviews. 后期指定的供应商-参与设计评审。
- To participate in team and customer meetings, design reviews and problem solving meetings. 参加与团队及顾客会议、设计评审和解决问题会议。
- Coordinates the review and acceptance of preliminary and final tooling design reviews with suppliers and Invensys SET team members. 初期规模为拥有设计工程师70人,并将随着中国、亚洲市场的产品设计需求的增加而不断发展壮大。
- Design review and pre-buy off in supplier site, support and assist installations in -CAF and final buy off. 在供应商处对设备进行设计审查和预验收,并在CAF现场协调设备安装和对设备进行终验收。
- Reviews Team Qingdao, although has certain striking power, but their superiority often polysome present main floors. 反观青岛队,尽管拥有一定的攻击力,但他们的优势往往更多体现在主场。
- New design review and project development follow-up, Provide technical support to production line and sub-contractor. 新产品跟进及导入,为生产线和加工厂提供技术支持。