您要查找的是不是:
- Design Review Board 设计审查委员会
- Engineering Design Review Board 工程设计审查委员会
- Coordinate the design review process. 协调设计评审。
- Involvement in Design Review Process with customers, suppliers and CTT UK. 参与和客户,供应商和英国总部的设计回顾。
- Design review on Mine General Hospital of Shenfu Dongsheng Coal Company Ltd. 神府东胜煤炭有限责任公司矿区总医院设计回顾。
- Provisions for die mounting will be specified at the preliminary design review. 在初级设计中应详细说明提供的模具安装说明。
- Design Review and Community Design Standards, City of Portland Oregon. 回顾显示代码内容的表格,显示替选方案及任意设计案之评论程序。
- Design review of boilers according to the codes TRD and ASME Sect. I. 按照TRD规范和ASME(美国机械工程师协会)第一部分进行对锅炉的设计审核。
- The study protocol and consent form were approved by the Texas A&M University institutional Review Board. 研究的草案和结果得到了德克萨勘斯大学研究综述公告的认可。
- The review board, OHRP charges, never asked for data on the safety of inhaled hexamethonium in people. 人类研究保护办公室还指控复核委员会从未索要有关人体可吸入的六甲铵的安全用量方面的数据。
- Design Review - Product concept can be captured and reviewed. 设计审查-产品概念可以捕获和审查。
- This also provides that the Chief Executive may appoint a review board to advise him on those representations relating to appointment,dismissal and discipline of public servants. 根据该命令,行政长官可委出一个覆核委员会,就如何处理有关公务员任命、革职和纪律事宜等申述向他提供意见。
- After Named Supplier - Participate in Design Reviews. 后期指定的供应商-参与设计评审。
- Formal Material Review Board( MRB) or similar system in place to deal with rejected material disposition, including“ scrap”,“ rework”,“ RTV”,“ UAI”, etc. 有正式的物料检讨系统(MRB)处理拒收物料;包括“报废”;“返工”;“退货”;“可用”等等.
- Failure Review Board investigated the failure and determined that the most likely reason for the malfunction was the unexpected setting of a single data bit. 故障审查会议上,调查了这个这次失败,并确认最可能性引起故障的原因是,设置了一个意外的单数据位。
- Design review and pre-buy off in supplier site, support and assist installations in -CAF and final buy off. 在供应商处对设备进行设计审查和预验收,并在CAF现场协调设备安装和对设备进行终验收。
- This also provides that the Chief Executive may appoint a review board to advise him on those representations relating to appointment, dismissal and discipline of public servants. 根据该命令,行政长官可委出一个覆核委员会,就如何处理有关公务员任命、革职和纪律事宜等申述向他提供意见。
- New design review and project development follow-up, Provide technical support to production line and sub-contractor. 新产品跟进及导入,为生产线和加工厂提供技术支持。
- Hence we initiated a design review of our full range of banknotes, which is near completion. 因此,政府对本港纸币的设计进行了一次全面的检讨,有关的检讨工作已接近完成。
- Project planning, Design review and Quality improvement of packaging, packs, Containers and Dollies. 包装、工位器具及部分辅助材料的成本降低。