您要查找的是不是:
- Design Change Package 设计修改建议
- The design change multiterminal of tea table. 茶几的款式变化多端。
- Create design change and process change requests if needed. 制定设计变更和工艺变更需求。
- Publishes the design change written notice,Renewal blueprint. 出设计更改通知书,更新图纸。
- Des the company have an effective design change control procedure in place? 该公司有有效的设计更改控制程序吗?
- Principle Duties Create design change and process change requests if needed. 如有必要,按要求更改设计或流程。
- Prepare quality plan and inspection sheet for new project or design change. 制定新产品或设计更改的产品的质量控制计划。
- Dropped projects can stillbe accessed as read-only from the Change Package and Locks views until the project is purged orreclaimed by your administrator. 被结束的项目依然可以从变更包和锁定视图中以只读的方式访问,直到这个项目被管理员清理掉或者恢复。
- Depending on theoptions you select when dropping the member, MKS Source can also delete themember's working file and close any associated change package. 可以根据在结束成员时你作出的选择,MKSSource可以删除一个成员的工作文件,并关闭和这个变更包的任何联系。
- Managing Database Design Changes with Rational Data Architect. 提供了关于进行数据库影响分析的有用信息。
- Finally, the application of the system to the design change of airframe structural members was summarized. 最后 ,总结了先进CAD/CAE系统在飞机改型设计中的应用效果
- The Change Request Management application template helps users track risks associated with a design change. 变更要求管理应用程式范本可以帮助使用者追踪与设计变更相关的风险。
- Payment issue, import &export , CCC , quality, design change , wrong shipment etc. 如:付款问题,部件不良,进出口,CCC,设计更改,错到货等等。
- The only design change that is counter to this new philosophy of expedience is the new mechanic for Mines. 唯一和这种“便利性”相冲突的设定就是“矿洞”了。
- During construction, problems often arise which require design changes. 在施工过程中,常会出现需要改变设计的问题。
- And you know any design change relating to electrocircuit doesn't conform to "UL"&"CE", and need a need application. 只要在电路上进行了设计更改都不符合"UL"&"CE",需重新申请;
- But from in last few years bedchamber design looks, the design change of lie in bed is the biggest. 但从近几年卧房设计来看,卧床的设计改变最大。
- But from in last few years in light of bedchamber design, the design change of lie in bed is the biggest. 但从近几年来的卧房设计来看,卧床的设计改变最大。
- RF assembly unavailable for impact testing as design changes delay development. 在冲击测试时RF配件无作用,在设计变更延迟发展时。
- To use the Team Foundation Server Language Change Packages, you must also have a localized copy of Team Foundation Server for the destination language. 要使用Team Foundation Server语言更改包,您还必须拥有目标语言的Team Foundation Server本地化副本。