您要查找的是不是:
- Is responsible for any design change documentation "ECR‘s"back to Amstore Engineering, and new print submissions from Supplier back to Amstore. 负责将所有在产品设计上进行的改动文档以ECR的方式回传给公司工程部,同时也需要将供应商对于新图纸的意见告知公司。
- Design Change Document 设计更改文件
- Change Document Display Master Rec. 更改文档显示主记录。
- The design change multiterminal of tea table. 茶几的款式变化多端。
- Create design change and process change requests if needed. 制定设计变更和工艺变更需求。
- Publishes the design change written notice,Renewal blueprint. 出设计更改通知书,更新图纸。
- Changes document direction to right-to-left. 将文档方向改为从右向左。
- Des the company have an effective design change control procedure in place? 该公司有有效的设计更改控制程序吗?
- Principle Duties Create design change and process change requests if needed. 如有必要,按要求更改设计或流程。
- Prepare quality plan and inspection sheet for new project or design change. 制定新产品或设计更改的产品的质量控制计划。
- Managing Database Design Changes with Rational Data Architect. 提供了关于进行数据库影响分析的有用信息。
- Finally, we use Extensive Markup Language (XML) to express the general engineering change document, and the Document Type Definition (DTD) of engineering change beaed on XML is also given. 最后 ,引入扩展标记语言来描述通用的工程更改文档 ,并给出了基于XML的工程更改文档类型定义方案。
- Finally, the application of the system to the design change of airframe structural members was summarized. 最后 ,总结了先进CAD/CAE系统在飞机改型设计中的应用效果
- Within the folder on all documents (a folder) Batch Rename: Batch Change document first name or extensions. 对文件夹内的所有文件(子文件夹)批量重命名:批量更改文件的主名或扩展名。
- The Change Request Management application template helps users track risks associated with a design change. 变更要求管理应用程式范本可以帮助使用者追踪与设计变更相关的风险。
- Payment issue, import &export , CCC , quality, design change , wrong shipment etc. 如:付款问题,部件不良,进出口,CCC,设计更改,错到货等等。
- During construction, problems often arise which require design changes. 在施工过程中,常会出现需要改变设计的问题。
- Review and distribute change documents, document control of contract drawings at the project site. Expediting of materials to the project site. 审核、分发变更文件,项目现场合同图纸及现场变更文件控制以及现场材料的催交;
- The only design change that is counter to this new philosophy of expedience is the new mechanic for Mines. 唯一和这种“便利性”相冲突的设定就是“矿洞”了。
- RF assembly unavailable for impact testing as design changes delay development. 在冲击测试时RF配件无作用,在设计变更延迟发展时。