- The Balanced Dynamic Critical Path Scheduling Algorithm of Dependent Task Graphs 相关任务图的均衡动态关键路径调度算法
- Critical Path Scheduling Method 关键路径调度法
- critical path scheduling 临界途径法,关键途径法,关键路线计划
- On our most projects Critical Path Method( CPM) is used for scheduling. 在我们的大多数工程项目中都采用“统筹法”(关键路线方法,简称CPM)排计划。
- The critical path method was originally developed to solve scheduling problems in an industrial setting. 关键路线方法最初的发展是为了解决一项工业安装的安排问题。
- The arrow diagram does not indicate critical path. 箭线图表不注明主要的路径。
- In this paper,a novel genetic algorithm,namely critical path based genetic scheduling algorithm(CPGS),was developed for multiprocessor scheduling. 基于遗传算法提出了一种新颖的多处理器任务调度算法CPGS。
- Critical path and critical activities: time management principles. 关键路径与关键作业的权衡之道:时间管理法则。
- Explain the strengths and weaknesses of critical path analysis. 解释关键路径分析的优缺点。
- critical path schedule [经] 关键路线进度表
- Show the critical path for your project to quickly find problem tasks. 显示项目的关键路径:以快速查找有问题的任务。
- Identifying and discuss critical path items on each job before mobilization. 动员进厂之前,辨别并讨论每项工作的关键路径项。
- Critical path method of scheduling, CPM 关键路径计划法
- The key is whether you are sticking to the "critical path" when you organize your time, work space, and goals. 关键是当你安排自己的时间、工作范围以及工作目标时,你是否坚定不移地走在一条“至关重要的道路”上。
- Critical Path Planning and Scheduling 关键路线计划和安排
- The key is whether you are sticking to the critical path when you organize your time,work space,and goals. 关键是当你安排自己的时间、工作范围以及工作目标时,你是否坚定不移地走在一条“至关重要的道路”上。
- To delivery, and as a consequence puts test activities unnecessarily on the critical path of the project. 交付而完成测试准备,并且作为将不必要的测试活动放在项目的关键路径上的结果。
- Follow-up the critical path of establish of the overall long and short term goals, objectives and priorities needs. 跟进所有短期和长期进度表以满足工作目标和需要。
- Specifically, you should consider the mean time between failures (MTBF) of each device in the critical path. 具体地说,应考虑关键路径中每个设备的平均故障间隔时间(MTBF)。
- You want to analyze the critical path for each phase as well as the overall project. 希望分析每个阶段以及整个项目的关键路径。