您要查找的是不是:
- Abstract: The issues on FTTH engineering,including construction cost analysis,optical cable laying,optical fiber allotment,optical fiber connection and device installation,are discussed. 摘要: 就光纤到户(FTTH)工程中的建设成本分析、光缆布放、光纤分配、光纤连接、设备安装等有关问题进行了探析。
- Construction Cost Analysis of Hydropower Projects in the "Tenth Five Year Plan" "十五"水电建设项目造价水平分析
- To supervise the activity of product cost analysis. 管理产品成本分析工作。
- Energy cost analysis and report. 能耗分析和汇报工作。
- Construction Cost Analysis 施工成本分析
- Conduct price negotiation based on cost analysis. 基于成本分析,执行价格谈判;
- In charge of Logistics Cost Analysis. 负责物流费用收集及分析。
- He displayed admirably in establishing standard data, and a standard cost analysis system for our accounting department. 他建立了产品控制标准数据,并为财会部建立了一套标准成本分析系统。
- Make monthly financial expense report and cost analysis. 各项费用的月底分账及费用分析。
- Cost Analysis of the Departure-EnRoute Merge Problem. 离场-航线飞行合并问题的成本分析。
- Sales resource sizing &allocation, sales cost analysis &benchmark. 销售资源配置,销售成本分析及评估。
- Familiar with cost analysis of machining foundry etc. technology. 熟悉机加、造等加工工艺的成本分析。
- The construction method of indoor gas copper tubing embedment, problems existing in the installation and the solutions are discussed, and the cost analysis is made. 摘要探讨了室内燃气铜管暗设的实施方法、安装中出现的问题和解决方法,进行了成本分析。
- To prepare all of financial statement relevant to construction cost and investment. 编报有关基建投资成本等各类报表。
- System construction cost low, the maintenance cost are few, but largely reduces the project cost. 系统造价低,维护费用少,可大幅降低工程成本。
- Flexibility: At the same time of saving construction cost, MRL and SMR elevators provide designers more free space. 体积小的交流无齿轮曳引机,使无机房或小机房电梯的布置成为可能,在节省建筑成本的同时,提供给设计师更多的自由空间。
- Qualification Certificate on Project Construction Cost Consultation awarded by the Ministry of Construction of China. 中华人民共和国建设部颁发的工程造价咨询甲级资质证书。
- To establish cost analysis tools and procedure and improve them continuously. 建立新产品成本分析的工具和程序平台,并持续改进原有的工具和程序。
- Design stage is the key point of controlling the construction cost, and more attention should be paid. 设计阶段是对工程造价影响最大的阶段,是控制建设项目工程造价的重点,应引起足够的重视。
- The process and cost analysis software is designed for producibility of fuzes. 基于对引信设计的可生产性考虑,开发了工艺与成本分析软件。