Construction of the mud slab will be included in the Piling Contract. The Substructure Contractor should allow for breaking up and removal as and when required.

 
  • 铺设泥土石板路面将包含在打桩合同中。如有必要,地下建筑承包商负责对其拆除与清理。
今日热词
目录 附录 查词历史