Considering the disturbance of due dates of jobs in scheduling, we design a new crossover which makes each machine keep the critical sub-schedule in the generation of offspring.

 
  • 考虑工作交期可能带来的干扰,所设计的操作元在生成子代的过程中,将保持最关键的一段子排程。
今日热词
目录 附录 查词历史