Connection between post, upper rail shall be mounted by taper pin or welding,the specified method refer to the details followed.

 
  • 立柱与扶手管、横杆间采用销钉固定或焊接固定的方式,具体的连接方式见后面的的详细要求。
今日热词
目录 附录 查词历史