Combined with the classification identification of the risk factors in ACP and the POA-based principles of RA, the RA scheme based on those principles and process model was designed.

 
  • 通过对代建项目的风险因素进行分类识别,依据基于项目所有权配置的风险分担原则及过程模型,设计了初步的风险分担方案。
今日热词
目录 附录 查词历史