Choosing suitable confi guration and controlling the unevenness of the surface at the sudden enlargement drop sill after the operating gate, this tunnel may avoid or mitigate cavitation.

 
  • 在工作闸门区突扩跌坎处,选择合适的体型并严格控制表面不平整度,可达到防止或减小空化的目的。
今日热词
目录 附录 查词历史