Check system pressure after water is heated. If pressure is too high, drain water from boiler and adjust feed water regulator to 12 PSIG.

 
  • 在水加热后,检查系统压力。如果压力太高,则从锅炉将水排泄出来,并且将进水调节阀压力调节到12PSIG。
今日热词
目录 附录 查词历史