您要查找的是不是:
- CAD for Piled Foundation 桩基础计算机辅助设计
- Restricted by understand level and computational method, many engineers employ the traditional means for pile groups to design thinned pile foundation, apparently, a good deal of resource is extravagant. 然而由于认识水平和计算手段所限,许多设计工程师还是采用传统的群桩设计方法进行设计,造成很大的浪费。
- Investigation of Geotechnical Engineering, Ground Treatment of Soft Soil, Analyses and Disposal about Earthquake Liquefaction of Foundation Soil, Observation and Detection of Geotechnical Engineering (especially for Pile Foundation) etc. 岩土工程勘察、软土地基处理、地基土地震液化分析与处理、岩土工程监测与检测(特别是桩基检测和试验)等。
- Introduction of CAD for Mechatronic System ? 机电系统cad导论
- CAD for crown profile curve fitting of diamond bit. 金刚石钻头冠部曲线拟合的计算机辅助设计。
- The Construction Technology of Solid Floor Engineering for Pile Foundation 桩基工程硬地坪施工技术
- DX pile is a new-style pile foundation. DX挤扩灌注桩是一种新型的桩基础。
- The damage status of pile caps is investigated for piled wharf. 摘要调查了高桩码头桩帽破损情况;
- This would be the prime concern for consideration of the pile foundation alternative. 这是选用桩柱地基所须考虑的首要问题。
- Application of Bored Cast-in-place Steel Tubular Mini-pile Socketed in Rock for Pile Foundation Underpinning 钻孔嵌岩微型钢管灌注桩在桩基托换工程中的应用
- Primary Investigate into Technique of Detection for Pile Foundation on Long Trunk Railway 铁路长大干线基桩检测技术初探
- PRELIMINARY INVESTIGATION OF SHARING LOADS FOR PILE FOUNDATION IN INVERSE ORDER DURING CONSTRUCTION 桩基逆作法中的荷载分配初探
- The long-shot pile foundation is a new type of foundation. 因此,为安全地推广和不断发展这种新型基础,有必要对其工作性状进行系统研究。
- Construction Technology for Pile Foundation at 2nd Bidding Section of 10th Highway in Dalian-Zhuanghe High-Speed Road 大连-庄河高速公路10号路2标段桩基础施工技术
- Construction Technology for Pile Foundation on Boulder in Limestone Valley Plat and Worse Leach Hole Substrate 灰岩冲沟地段漂石、溶洞不良地层桩基础施工技术
- Analysis of Comparing Static Load Experiment with Large Strain Test for Pile Foundation 桩基静载试验与高应变对比分析
- In the CAD for blanking die,how to correctly discriminate the dimension types of the edge is a key work. 在冲裁模刃口尺寸的计算机辅助设计中,正确地识别尺寸类型是设计、计算最关键的一步。
- Karst Cave Treatment for Pile Foundation Construction of Main Bridge of Meizhou Bridge 梅州大桥主桥桩基施工溶洞处理
- COSTRUCTION TECHNIQUE OF ROTARY DRILLING FOR PILE FOUNDATION OF BRIDGE IN PERMAFROST AREA 多年冻土区桥梁桩基旋挖钻施工
- Software developing principle of CAD for roller machine has been introduced with background,structure,pri-mary contents and methods. 介绍了卷板机CAD软件的开发原理,给出了系统的开发背景、结构、基本内容和方法。