By founding integral hydraulic transition process mathematics calculation model,combined with the physical model test,the arrangement of the diversion system was optimized.

 
  • 建立完整的锦屏二级水电站水力过渡过程计算数学模型,结合引水系统整体物理模型试验,优化引水发电系统总体布置。
今日热词
目录 附录 查词历史