By default, there is no cool-down period, and individual tests are terminated when the load test finishes based on the Run Duration setting.

 
  • 默认情况下没有冷却阶段,负载测试结束时根据“运行持续时间”设置来终止单个测试。
今日热词
目录 附录 查词历史