But to mid-mini type dam construction, it is improper to use traditional RMR ? H-B method to evaluate the quality of joined rock mass, because the RMR system is build on the basis of the probability statistic model of geological data.

 
  • 但是,对于中小型的坝基工程,采用该方法进行岩体质量评价则存在一定的局限性,主要是因为RMR体系是建立在地质资料的概率统计模型基础上的,为了保证模型完整的体现区域岩体的地质特性,必须对现场的岩体进行大规模的地质调查,搜集大量的数据资料,以期对岩体地质分布特征作出合理的估计;
今日热词
目录 附录 查词历史