Before the station system commissioning, the low voltage energization test has been done for the HV capacitor banks in AC filters and shunting capacitors.

 
  • 摘要在江陵换流站站系统调试前,对交流滤波器和并联电容器中的高压电容器组进行了低压加压试验。