Before the 168 IOD service project was on line, pressure test was needed to test if system s pressure burden ability is up to predicted.

 
  • 移动168信息点播业务系统扩容工程上线之前,为检验其是否能够达到包括预期的负荷承受力,需要进行压力测试。
今日热词
目录 附录 查词历史