Because of no measures to resist floating in design,a power plant ash pond floated and inclined with the groundwater flotage after construction,which have influenced the normal use of the ash pond.

 
  • 某发电厂沉渣池由于设计时没有考虑抗浮措施,施工完成后,池体在地下水浮力的作用下上浮倾斜,严重影响池的正常使用。
今日热词
目录 附录 查词历史