Based on work breakdown structure (WBS), technical risks were identified and technical risk breakdown structure (TRBS) can be set up.

 
  • 因为场馆建设过程中使用的技术和材料等比较新颖,因此缺乏历史数据和经验。
今日热词
目录 附录 查词历史