Based on the on-site inspections of the lining defects in Baishanzui tunnels, the model and size of the defects are analyzed with FLAC program.

 
  • 该文在白山嘴输水隧洞实际衬砌结构缺陷现场检测的基础上,分析了缺陷模式和尺寸,提炼出缺陷特征,并采用FLAC程序进行了计算分析。
今日热词
目录 附录 查词历史