您要查找的是不是:
- Problems and Check and Treatment on Differential Protection of High Tension Transformer at Baozhusi Hydropower Plant 厂高变差动保护存在的问题及检查处理
- Baozhusi hydropower plant 宝珠寺水电站
- We're going to pipe electricity in from a hydropower plant. 我们将从水电厂输电出来。
- We get electricity from a hydropower plant. 我们将从水电厂输电出来。
- The optimized reservoir ope ration is simulated for Baozhusi hydropower station in Sichuan.The analysis resu lts prove the rationality , feasibility and practicality of the model. 采用解析法对主梁进行了挠度计算,与试验数据进行比较并分析了计算结果,认为桥机主梁的主梁强度、刚度实时检测、监控系统基本上是可靠的,主梁2基本没有塑性变形。
- We are going to pipe electricity in from a hydropower plant. 我们将从水电厂输电出来。
- The guaranty calculation of regulation is one of the important contents in the design of hydropower plant. 调节保证计算是水电站设计中的重要内容之一。
- The link from the Xiangjiaba hydropower plant to Shanghai is scheduled for completion in 2011. 这条从向家坝水电站到上海的电力线预计在2011年完工。
- Expert System for Hydropower Plants Realtime Monitori ng? 要害词:实时监控;专家系统;软件;结构?
- Hydropower plant is the most important executer of AGC system, for it is easy to adapt its output of active power. 水电厂易于改变有功功率的输出值,是电力系统自动发电控制的主要执行者。
- The surface outlets at Ertan hydropower plant are arc gates,and the hoisting devices are duplex hydraulic hoists. 二滩电厂表孔采用弧形门,启闭形式为双缸液压启闭机。
- Analysis on Piezometer Condition at Baozhusi Hydropower Station 宝珠寺水电站测压管工况浅析
- The Beixi Hydropower Station is the biggest hydropower plant in Yongjia County, Zhejiang Province and plays an important role in the power system of Wenzhou. 摘要北溪水电站是浙江省永嘉县装机最大的水力发电站,在温州电网中起着重要的作用。
- The reliable power supply question of hydropower plant's monitoring system,directly influences its key function display. 水电厂监控系统电源的可靠性供电问题,直接影响其关键作用的发挥。
- Abstract: There are differents ways to maintain normal navigation in navigable channel during channel enclosure for building hydropower plant. 摘 要: 如何使通航河道在水电站截流至船闸正式通航期间维持正常的航运,其做法不一。
- The methods,items of precautionary test for the electric equipments of Geheyan Hydropower Plant and the test results are summarized briefly. 对隔河岩水电厂电力设备预防性试验的方法、试验项目及试验效果作了简要综述。
- In addition to dams and tunnels through the Maluti mountains, the project includes a 72-megawatt hydropower plant that will supply power to Lesotho. 在本文撰写期间,第三座大坝,即次期工期,还正在由双方政府讨论之中。
- Optimal dispatching system of hydropower plant is a complex project.Now there is not a systemic, perfect and ripe scheme to solve it. 水电厂优化调度系统是一项复杂的系统工程,目前在水力发电领域,还没有一个系统的、完善的、成熟的解决方案。
- The paper expounds the installation procedure of 3# unit under-rack and thrust bearing in Lijiaxia hydropower plant,and proposes the measurement to obtain the design requirement. 文章重点阐述了李家峡水电站3%23机组下机架与推力轴承安装过程,以及为达到设计要求,对变形控制所采取的工艺措施。
- On the aspect of displaying of real-time data in hydropower plant,the implement metho d, of server taking the initiative in transmiting data by PUSH technology is pro posed. 在水电厂数据的实时显示方面 ,提出利用 PUSH技术实现服务器主动发送数据的方法。