您要查找的是不是:
- BOP stack unitizatio 防喷器组合装置
- Test the BOP stack on the stump. 在试验桩上试验防喷器组。
- Place BOP stack on the test pump. 将防喷器组放在试压桩上。
- Rig up the 135/8 "BOP stack onto the well head. 将135/8"防喷器组移到井口。
- Place BOP stack on the test stump. 将防喷器放在试压桩上。
- Pick up test mandril and place in BOP stack. 吊起试压防喷器芯子并装入防喷器组。
- Gig up the 13-5/8" BOP stack onto the well head. 将13-5/8"防喷器组移到井口。
- Run the guide lines into the guide posts on the BOP stack. 将导向绳装进防喷器组上的导向柱内。
- Hoist the BOP stack with the hook and have an overall check. 用钻机大钩提起防喷器组并进行全面检查。
- Lift BOP stack and replace wellhead connector AX ring. 吊起防喷器组并更换连接器AX密封圈。
- Use the BOP crane to pick up the BOP stack onto the beams of the moonpool. 用防喷器吊车将防喷器组吊到滑动门上。
- Set the BOP stack on the stump and close the hydraulic connector, and then secure it. 将防喷器组吊坐到甲板试验桩上、关液压爪形连接器,并固定。
- Set the BOP stack on the stump and close the hydraulic connector ,and then secure it. 将防喷器组吊坐到甲板试验桩上,关液压爪形连接器并固定。
- In floating offshore operations, the choke and kill lines exit the subsea BOP stack and then run along the outside of the drilling riser to the surface. 在进行浮动的海上作业时,节流和压井管线从水下防喷器组出来,之后沿钻井隔水导管外侧面到达水面。
- 328、 Pick up test mandril and place in BOP stack. 吊起试压防喷器芯子并装入防喷器组。
- How much do all these figures stack up to? 这些数字的总和是多少?
- That little bop made away with the big pie. 小男孩把大馅饼吃光了。
- Stack the risers on the rack with the BOP crane. 防喷器吊车将隔水管排入管架内。
- 315、 Lift BOP stack and replace wellhead connector AX ring. 吊起防喷器组并更换连接器AX密封钢圈。
- CONTROL SYSTEM FOR SURFACE MOUNTED BOP STACKS 地面防喷器控制装置