At the Fangchenggang Port, the 10,000 ton level berths, No. 9 and No. 10, formally began work not long ago. It was followed by preparing to construct larger berths, No. 11 and No. 12.

 
  • 在防城港,九号、十号万吨级码头不久前正式动工,紧接着更大的十一号、十二号泊位又开始筹建。
今日热词
目录 附录 查词历史