And then made simulation of the 135MWe CFB boiler of Xin Xiang power plant with msc2000 and analyzed the simulation result. At last, we put forward a primary design of a 600 MWe supercritical CFB boiler.

 
  • 然后,利用该模型,在msc2000仿真平台上对一台135MWe循环流化床锅炉的额定负荷工况、变负荷工况、变过量空气系数和变二次风率等工况进行仿真,并对仿真结果进行了分析。
今日热词
目录 附录 查词历史