Alternatively, if the requirements, design constraints, and scope of the requirements have not yet been defined at this point, the workshop must take on a different course.

 
  • 另外,如果此时还没有定义需求、设计限制以及需求的范围,则研讨会必须采用一个不同的过程。
今日热词
目录 附录 查词历史