All tubing shall be tagged at both ends, when the run is longer than 10 ft (3 m), and at any module penetration, with a unique identification code.

 
  • 如果导压管长度大于10英尺(3米),所有导压管应在两头安装标签;而且在任何穿透性模件上配备一个独特的识别编码。
今日热词
目录 附录 查词历史