Aiming at the character that gas well isochronal testing consists of many drawdown and build-up cycles, the flowing and build-up pressures are regarded as contunuous action process.

 
  • 针对气井等时试井一般由多个开关井测压周期组成的特点,将每个测压周期流动压力和恢复压力看成是连续作用过程。
今日热词
目录 附录 查词历史