After oilfield is put into development by water flooding, the water injection system would be easily to form scaling, which seriously affects the operation of the surface water injection system and the water absorbability of the water injection well.

 
  • 摘要油田投入注水开发后,注水系统容易结垢,严重影响地面注水系统运行和注水井吸水能力。
今日热词
目录 附录 查词历史