您要查找的是不是:
- Adit planimetric 坑道平面图
- adit planimetric map 坑道平面图
- Tashan mine are excavated in a main and a auxilary adit. 同煤集团塔山矿采用主、副平硐开拓方式。
- We immediately got our helmet and headlight and go down the adit. 我们立即领取了头盔及头灯,准备下矿洞探险。
- Adit Testdesk ownership for organizations of any functional test. Adit Testdesk 拥有用于组织测试的任何功能。
- This time we will only go down the adit 600 meters from the start point. 这次我们的探险旅程只深入矿洞内,往下走约六百米的地方。
- Topographical maps not only show planimetric position but also indicate relief by some method. 地形图不仅表示出平面位置,而且还通过某种方法显示地貌。
- The measured adit water temperature verifies the predicted results and the system behavior proves desirable. 系统运行后,坑道水温度变化实测数据基本验证了预测结果,系统运行效果良好。
- The planimetric position of the piles which endure the extremum axial force is different. 受开挖区域的影响,承受轴力最大值、最小值桩体的平面位置是变化的。
- Collapse treatment in section of Hongye-2 Hydroelectric Power Station headrace tunnel downstream of adit No. 红叶二级水电站引水隧洞2号支洞下游塌方段处理。
- The planimetric maps and space diagrams of the pits and tunnel of random format (including inclinded format) are managed with database. 对于任意分幅(包括倾斜分幅)的井巷平面图,井巷立体图等,采用数据库的管理方式;
- With the progress of the mining operation in Lanjian Iron Ore year on year the effect of blasting vibration on safety of adit is increasing. 随着兰尖铁矿采场水平逐年下降,爆破震动对平硐的安全影响日益突出。
- The development systems are the adit and pass above 4100m level, and underground shaft under 4100m. 4100m以上选用平硐溜井开拓系统,4100m以下选用盲竖井开拓系统。
- The undisturbed soil is usually sampled through excavating shaft and adit,but through borehole sampling for deep soil. 目前 ,在工程实践中对原状土样的采取多通过开挖竖井及平洞的方法进行 ,但在埋深较大的情况下 ,由于开挖竖井及平洞较为困难 ,多采取钻探取样的方法。
- Mine exploit is divided into several phases. In the first phase, main adit is located at 4100m. 采用分期开采,前期主平硐设在4100m水平。
- We have an exciting activity in the first day, because the mine owner allow us to enter the adit. 想不到第一天便有惊喜节目,因为矿主特别准许我们下矿洞参观。
- Adit Testdesk the use of the test design has been tested to show the level of knowledge or what can be done. 使用 Adit Testdesk 的测试设计可以显示被测试者的知识水平或者可以做哪些事情。
- The results are helpful for designing and construction of intersection of main tunnel and adit in major highway tunnel. 研究结论对长大公路隧道设计、施工横通道,有一定参考价值。
- The algorithms of clipping, intersection and translation are also given when the dault demarcation line crosses the path of a borehole or an adit. 对于地质剖面图中断层分界线遇到钻孔或平洞的情况,文中建立了它们的求交、平移和裁剪算法。
- The results indicate that the adit is stabile and the value of the given critical antivibration velocity of rock is a little low. 结果表明现爆破下平硐是稳定的,规范中给定的岩体极限抗震速度有些保守。