您要查找的是不是:
- Activity Reorder Point 活动重新安排点
- The reorder point should cover the average material requirements expected during the replenishment lead time. 重采购点能够覆盖一般的物料需求,使其满足在补货提前期之内。
- Still others, for example selling price and reorder point, are generated by or needed by MANAGEMENT. 还有一些数据,例如销售价格和订货点由management产生,或者由它提出要求。
- To solve this problem, it is vital that the reorder point(ROP) of the node enterprises be carefully chosen. 为此,如何选择企业库存订货点水平和库存控制策略,是使企业保证较高的服务水平的同时降低库存费用的关键所在。
- Control material stock level according MX output and lead time, including safety stock, fixed lot-size, reorder point and planned delivery time. 根据MX产量控制库存量,包括安全库存,定货批量,计划交货期。
- How to optimize the reorder point and order quantity is a difficult problem for slow moving spare parts with high cost and long storage time. 摘要对价值高的慢速流动备件,如何确定其最佳再订货时间和订货批量,这是目前困扰企业的一个急需解决的问题。
- If demand and lead time are constant and known in advance, it would be easy to calculate the reorder point (as it is done in requirements planning). 一个关键的问题就是在前置期内,那种产品的需求量有多大。
- The calculated reorder point is that predetermined inventory level at which replenishment action is called for when on-hand and on-order drops to or below that level. 该系统会计算并预设安全库存量,当在库和在途的货量低于安全库存水平系统会提醒进行货物补充。
- Mitchell, C. R. , Rappold, R. A. and Faulkner, W. B. , “An Analysis of Airforce EOQ Date with an Application to Reorder Point Calculation,” Management Science, Vol. 29, No. 4, pp. 440-446 , 1983. 叶桂珍、林清河,“空军不可修复零附件存量管制与需求预测系统之研究”,行政院国家科学委员会国防科技发展方案学术合作协调小组研究计划成果报告,台北,1996。
- This paper discusses stock decision for random requirement with shortage cost, and the analysis is focused on problems of determining reorder point and obtaining the formula of store rate of shorts. 讨论了有缺货成本的随机需求量的存货决策,着重分析了在有缺货成本下,再订购点的确定及仓库出空率的计算公式。
- Reorder Point Planning with External Requirements 带外部需求的重订货点计划
- Reorder point under unknowing requirement 需求不确定条件下的再订货点
- Create requisitions, reorder point planning report option 创建请购单,重新订购点计划报表选项
- The office has been humming with activity. 办公室一直忙着搞活动。
- Time-phased Planning Process with Reorder Point Planning 带重订货点计划的时间段计划处理
- The threat of war has depressed business activity. 战争的威胁使经济萧条。
- There has been a lot of activity in the town today. 今天市中心相当热闹。
- The town was humming with activity. 该市镇生气勃勃,呈现一片热闹的景象。
- Stamp collecting is my favorite activity. 集邮是我最喜爱的消遣。
- The store was a scene of great activity. 这家商店顾客盈门。
- 今日热词
-
- 深远海浮式风电平台 - deep-sea floating wind power platform
-
- 京雄高速公路 - Beijing-Xiongan expressway
-
- 农业及相关产业增加值 - the added value of agriculture and related industries