Abstract: The working of laying sewage drain pipes resulted in periphery soil displacement seriously, partly landfall, partly soil loss and contortion of steel tubes.

 
  • 摘 要: 针对深圳市污水排水放流钢顶管已施工部分,因顶管施工过程中周围土体位移严重,局部出现过塌方,造成部分土体流失,引起钢顶管扭曲变形。
今日热词
目录 附录 查词历史