Abstract: The risk of seawall overtopping rate exists based on the formulas given by the specification in operation, which comes from the uncertainty of the input factors.

 
  • 文章摘要: 根据现有规范公式计算的海塘越浪量存在一定程度的风险,它主要来自越浪量计算参数的不确定性。
今日热词
目录 附录 查词历史