Abstract: Eddy current detection for new copper tubing should be carried out bef ore the replacement of copper tubing of condenser and oil cooler in thermal powe r plant.

 
  • 摘 要:火力发电厂凝结器、冷油器铜管更换前要对新铜管进行涡流检测,根据多年的检测经验,介绍在火力发电厂铜管涡流检测中的一点经验。
今日热词
目录 附录 查词历史