A special program (stage 2) has been carried out to design, manufacture and test the MCE-5 control device, resulting in a fully operational Compression Ratio control jack.

 
  • 了一项特别计划(第二阶段)已进行了设计,制造和测试的德育- 5控制装置,造成一个全面运作的压缩比控制杰克。
今日热词
目录 附录 查词历史