A 3D finite element model, of the substructure of the cut-and-cover tunnel for analyzing their coaction, is established.

 
  • 浃底隧道出口明洞段回填厚度较大而基础土体软弱,因此采用了桩-筏基础的形式以避免过大沉降带来的不利影响。
今日热词
目录 附录 查词历史