4 After the piping system passes the gas leakage test, the pressure shall be relieved in time and the test records shall be duly filled out.

 
  • 4管道系统气体泄漏性试验合格后,应及时缓慢泄压,并填写试验记录。
今日热词
目录 附录 查词历史